Critical Path 4+

Critical Path Method

Peter Tsang

Designed for iPad

    • 3.5 • 2 Ratings
    • $1.99

Screenshots

Description

This app is a project management tool for setting up tasks for various projects. You can define the sequence and length of tasks which will auto provide you a graph by critical path method. Moreover it provides indicators for overdue tasks for each project.

What’s New

Version 1.2

Updated with privacy question anwsered.

Ratings and Reviews

3.5 out of 5
2 Ratings

2 Ratings

hawaiian808808 ,

Good start, but

I wish we could choose to start at 0 instead of 1 as many tests start at 0. Also, the location of the duration is right where ES is usually located so kind of confusing. Then there is the pdf export. The CPM is about 1/40th the size of the pdf sheet. It should be adjusted to take up the whole sheet.

JamesHurt ,

James Hurt

4 decades ago, As a Professional Engineer, I used to prepare CPM’s by pen & paper and was familiar with concept and quickly was able to begin the CPM for my son’s new residential home construction.
I did send him the PDF of the in- progress CPM, but I don’t know how to collaborate via Internet and would like to have the YouTube video updated for that ASAP.

App Privacy

The developer, Peter Tsang, indicated that the app’s privacy practices may include handling of data as described below. For more information, see the developer’s privacy policy.

Data Not Collected

The developer does not collect any data from this app.

Privacy practices may vary, for example, based on the features you use or your age. Learn More

Supports

  • Family Sharing

    Up to six family members can use this app with Family Sharing enabled.

More By This Developer

台灣牌計一番(Lite version)
Games
台灣麻將拉莊表單(輕便版)
Utilities
oxox
Games
台灣牌計一番(IPhone 版)
Games
台灣麻將拉莊表單
Entertainment

You Might Also Like

Prometheus Mobile STO
Utilities
Eclipse QRA
Utilities
Voice MemoPad
Utilities
SciPro Math
Utilities
AR Tape: Measuring App
Utilities
Civil Engineering Calc
Utilities